Skip to content
CHERRVEYConstruction Services

Government / Institutional Infrastructure

Regional Office Network Rehabilitation

Civil Service Commission Regional Office X

Client
Civil Service Commission Regional Office X
Location
CSC Regional Office Building, Region X
Year
2026
Category
Network Rehabilitation
Reference
PO FATR 26-01-001

Requirement

Rehabilitate the regional office building network so structured cabling, switching, wireless access, and ISP connectivity operate as a coherent, documented system.

Structured rehabilitation of the regional office network: node installation and termination, managed switching, wireless coverage, cable management, and documented turnover.

CHERRVEY scope of work

  • Installation and termination of approximately 102 network nodes
  • CAT6 or higher structured cabling
  • Managed gigabit network switching
  • VLAN configuration
  • Load balancing and failover across multiple ISP connections
  • Multiple wireless access points
  • Structured cable management and patch-panel system
  • Integration with existing servers and firewall systems

Delivery and turnover

  • Network performance testing and certification
  • Project documentation
  • Floor plan and as-built layout
  • Network topology documentation

Next step

Planning a similar project? Discuss it with CHERRVEY.

Tell us what you are building, upgrading, or rehabilitating. We will review the scope and respond directly.

Discuss a Project

CHERRVEY Construction Services