Skip to content
CHERRVEYConstruction Services

Civil Service Commission · Regional Office X

Regional office network rehabilitation

Structured cabling, managed switching, wireless access and multi-ISP connectivity, with network testing and as-built documentation.

Equipment cabinets and cabling inside a server room (illustrative stock photo)
Illustrative photo · not the project site
Location
CSC Regional Office X, Cagayan de Oro City
Project year
2026
Scope
Network Rehabilitation

The work

Scope of work.

  • Installation and termination of 102 network nodes using CAT6 or higher cabling
  • Five managed gigabit switches, including VLAN configuration
  • Eight wireless access points for building-wide coverage
  • Cable management and a centralised patch-panel system
  • Multiple ISP connections configured for load balancing and failover
  • Integration with existing servers and firewall systems
Related services

Build with CHERRVEY

Have a similar requirement?

Talk to us about your facility and the work you need.